Missouri Botanical Garden Logo

An Illustrated History 
of the Missouri Botanical Garden
Illustrated History Home    Historical Timeline
Browse by Subject Matter    Garden Home 

   Search for   Advanced Search  
Total number of images matching your request: 51
Page 5 of 6

First Page | Previous Page | Next Page | Last Page

41.  Climatron Construction

Climatron Construction. Left: probably construction foreman of North American Aviation. Right: Eugene Mackey (d. 1968) of Murphy & Mackey Architects. I.D. by Harry B. Richman in T.L.S. 1/10/89. 




42.  Climatron Construction

Construction of the Missouri Botanical Garden's Climatron was a learning experience, since a geodesic dome had never been built before. Negative available. 




43.  Climatron Construction

Climatron Construction. Scaffolding 




44.  Climatron Construction

Climatron Construction 




45.  Japanese Garden construction.

Japanese Garden construction. Bridge construction. 




46.  Lehmann Building Construction

John S. Lehmann Building Construction. Gift of Walter Lewis 12/07/1987. 




47.  Lehmann Building Construction

John S. Lehmann Building Construction. Gift of Walter Lewis 12/7/1987. 




48.  Lehmann Building Construction

John S. Lehmann Building Construction. Gift of Walter Lewis 12/7/1987. 




49.  Lehmann Building Construction

John S. Lehmann Building Construction. Gift of Walter Lewis 12/07/1987 




50.  North American Tract. Construction.

North American Tract. Back of old lodge. Building dams and waterfalls, etc. leading to pond in North American Tract. Chandler in left background. Fullgraf in foreground. 




  First Page | Previous Page | Next Page | Last Page

 

Copyright © 2000-2024  |  Missouri Botanical Garden  |  Contact MBG Archives